Skip to main content
SAC 995432Service code

SAC Code 995432 – Site formation and clearance services including preparation

GST on Site formation and clearance services including preparation, SAC code 995432, is 18%. 9% central tax and 9% State tax within a State, 18% integrated tax between States.

SAC code
995432
Service
Site formation and clearance services including preparation
GST rate
18%
Who pays it
The supplier

Notification 11/2017-Central Tax (Rate), as amended to 1 Nov 2026.

GST rate for SAC 995432, as notified

18%Works contract of mainly earth work (over 75% of its value) for the Government or a local authorityInput tax credit as usualNo. 3(vii) of 11/2017-Central Tax (Rate)changed by 15/2025
18%All other construction services, works contracts includedInput tax credit as usualNo. 3(xii) of 11/2017-Central Tax (Rate)
18%Construction, engineering or installation together with the setting up of solar, wind or other renewable plants of Schedule I, no. 437Counts for 30% of the whole price; the goods are 70% of it, at 5%No. 38 of 11/2017-Central Tax (Rate)changed by 15/2025

Exempt in heading 9954

  • Nil. Pure services (no goods) to the Central or a State Government or a local authority, for functions of a Panchayat or a Municipality. No. 3 of Notification 12/2017-Central Tax (Rate)
  • Nil. Composite supply with up to 25% goods to the Government or a local authority, for functions of a Panchayat or a Municipality. No. 3A of Notification 12/2017-Central Tax (Rate)

From Notification 11/2017-Central Tax (Rate) and its exemptions, 12/2017, as amended to 1 Nov 2026, read on 25 Nov 2026; the words are shortened. When in doubt, ask your tax adviser.

Reverse charge and TDS

Reverse charge
No. Notification 13/2017-Central Tax (Rate) does not name this service: the supplier charges the tax and pays it. A supplier who is not registered charges none, and the buyer owes none in their place, except a promoter on a building project (section 9(4)).
995431Demolition services18%
995433Excavating and earthmoving services18%
995434Water well drilling services and septic system installation services18%
995435Other site preparation services nowhere else classified18%
995439Services involving repair, alterations, additions, replacements, maintenance of the constructions covered above18%

Questions about SAC 995432

What is the SAC code for Site formation and clearance services including preparation?

995432: “Site formation and clearance services including preparation services to make sites ready for subsequent construction work, test drilling and boring and core extraction, digging of trenches”, in heading 9954 (Construction services) of the classification of services under GST.

What is the GST rate on Site formation and clearance services including preparation, SAC 995432?

Works contract of mainly earth work (over 75% of its value) for the Government or a local authority: 18% (no. 3(vii) of Notification 11/2017-Central Tax (Rate)).

Does reverse charge apply to SAC 995432?

No. Notification 13/2017-Central Tax (Rate) does not name this service: the supplier charges the tax and pays it. A supplier who is not registered charges none, and the buyer owes none in their place, except a promoter on a building project (section 9(4)).

How many digits of SAC 995432 does a GST bill need?

Up to ₹5 crore of turnover in the last financial year: four digits, 9954, on bills to registered buyers; on bills to others the code may be left off. Above ₹5 crore: six digits, 995432, on every bill (Notification 78/2020-Central Tax).

Codes and rates on the item

Laabam.One keeps the HSN or SAC code and the GST rate on the item and fills them in on every invoice, every e-invoice and GSTR-1.